Alert 2/9/22 | 3:12 PM: Santa Clara County sees record dry weather to begin 2022.Learn more
FYI 1/19/22 | 2:50 PM: Mobile COVID-19 testing bus at Valley Water Mondays and Wednesdays through February (except 2/21)Learn more
Protect & Restore
Stewards of creeks, the bay, and aquatic ecosystems
Image
亚博电竞苹果手机app下载
页面标题
亚博电竞苹果手机app下载
回到顶部

公共审查文件

Content

以下文件受到公众审查。请随时下载这些文件。请特别注意每个文档的审核期。如果您想提交评论,请将电子邮件发送给每个项目的项目经理。

If there are no documents listed below, there are none currently out for review.

Water Treatment Plants Electrical Improvement Project

什么:关于工程师报告和CEQA豁免确定的公开听证会

When: Tuesday, February 8, 2022, 1:00 p.m

在哪里:https://valleywater.zoom.us/j/82025651780

Why:这圣克拉拉谷水区(Valley Water or District) invites you to a meeting regarding the Water Treatment Plants Electrical Improvement Project (Project). The proposed work of improvement is described in the Engineer’s Report for the Water Treatment Plants Electrical Improvement Project. The Report is available here://www.ateljeeunlimited.com/WTPEIP_Report

A copy of this Notice has been posted outside Valley Water’s offices at 5700 Almaden Expressway, San Jose, CA 95118.

水处理厂的电气改善项目的工作范围包括升级老化式开关板和电动机控制中心,提高发电能力,更换监控和控制设备以及在Penitencia水处理厂(第3区)和Santa Teresa Water安装谐波过滤器治疗厂(第7区)。该项目的完成将确保更安全的工作条件,适应以后的升级以及降低电气故障导致的停机时间。

At the time and place fixed for the public hearing, the Board of Directors will receive comments on the Engineer’s Report and the CEQA exemption determination for the Project and consider approving the Project’s CEQA exemption determination in accordance with the California Environmental Quality Act. After considering the comments on the Engineer’s Report, the Board will decide whether or not to proceed with the Project.

For more information,,,,contactMae Siendo(408)630-2384and/or布兰登·庞斯(Brandon Ponce)(408)630-2787

重要通知
this meeting is being held in accordance with the BrownAct, as currently in effect.水的办公室不向公众开放。1:00 PM, February 8, 2022 public hearing will be held during a virtual Board Meeting accessible to the public athttps://valleywater.zoom.us/j/82025651780。

在遵守《美国残疾人法》(ADA)的山谷水中,请求需要特殊住宿的个人访问和/或参加Valley Water Board会议,请联系(408)630-2711的董事会职员预定的山谷水板会议之前至少有3个工作日,以确保山谷水可以为您提供帮助。将做出合理的努力来容纳残疾人。

Calabazas Creek Bank Rehabilitation Project

圣克拉拉谷水区(Valley Water)已批准Calabazas Creek Bank Rehabilitation Project(拟议项目)将于9月14日,根据CEQA指南第15075条发布了确定通知。

项目描述:谷Wateris proposing bank rehabilitation at 10 sites where creek banks have eroded. Bank rehabilitation work totals approximately 1,535 linear feet and 0.5 acre of work across approximately 0.7 mile of Calabazas Creek between Miller Avenue (downstream end) and Bollinger Road (upstream end) in Cupertino. Generally, two bank rehabilitation treatments would be applied: riprap bank protection and sheet pile walls. Riprap bank protection involves the placement of large rocks or boulders along the bank to stabilize the bank, whereas sheet pile walls involve installation of vertical, metal walls to protect the bank from further erosion. Work would generally be conducted in three phases for each site: 1) site preparation, 2) bank protection, and 3) site restoration. Following the bank rehabilitation work, the project area would be revegetated and restored pre-project conditions to the maximum extent practicable

Project Review:NOD将在Valley Water的网站//www.ateljeeunlimited.com/public-review-documents上发布三十天(直到2021年10月20日)。该点头还发布在圣克拉拉文员录音机办公室和计划与研究办公室(OPR)。

接触:谷Water
注意:亚历克斯·亨特
5750 Almaden Expressway, San Jose, CA 95118

For further information please contact Alex Hunt at (408) 630-3007, or by email at[email protected]

Purified Water Project Scoping Meeting for the Environmental Impact Report

什么:环境影响报告的范围会议
WHEN:March 29, 2021 at 5:30 p.m.
在哪里:通过Zoom在线:https://valleywater.zoom.us/j/94477342812


the proposed Project would include the construction of a new advanced water purification facility (AWPF), water conveyance pipelines to the existing LosGatos RechargeSystem complexlocated in theCity of Campbell,,,,圣克拉拉县的横向管道和相关设施。这AWPF将位于现有位于圣何塞的Zanker Road的硅谷高级净水中心,或位于帕洛阿尔托的前Los Altos治疗厂(FLATP)的替代地点。拟议的项目将使用先进的水纯化过程,包括反渗透(RO)处理,并会产生纯净的水以进行地下水充电。

拟议项目的目的是为圣克拉拉县建立更大的供水可靠性,并帮助确保持续的地下水可持续性。拟议的项目实现此目的的目标如下:

  • Support Valley Water’s water supply reliability goals, including the provision of at least 10% of all water supplies through recycled water
  • Develop the use of purified water, consistent with Valley Water’s adopted Water Supply Master Plan 2040.
  • 实施一个饮用的重用供应项目,可提供10 mgd至12.5 mgd的生产能力,每年收益率约为11,200次可持续纯净的供水,以满足长期/未来需求。

作为拟议项目的首席机构的谷水已经确定需要一份环境影响报告(EIR)以满足《加利福尼亚环境质量法》(CEQA)的要求。EIR草案将评估拟议项目的环境条件,替代方案的范围,与拟议项目实施相关的潜在环境影响,并提供缓解措施。

通知的准备(NOP)已经准备了一个d circulated to local, state, and federal responsible for the proposed Project’s approval and permitting for a 30-day review period for the purpose of defining the scope and content of the draft EIR. The NOP can be accessed online at://www.ateljeeunlimited.com/PublicReviewDocuments.aspx

A scoping meeting will be held on Monday, March 29, 2021 via Zoom and will provide an opportunity for the public to learn about the proposed Project, ask questions, and provide some comments. If you are not able to attend the meeting but would like to provide written comments for consideration during preparation of the draft EIR, please send comments no later than Tuesday, April 27, 2021 at 5 p.m. to:

圣克拉拉谷水区
Attention: Elise Latedjou-Durand
高级环境规划师
5750 Almaden Expressway
San Jose. CA 95118 or
[email protected]

For further information please contactElise Latedjou-Durand在(408) 630-3205 or by email.

继续实施针对RanchoCañadade Pala Preserve的两个长期管理计划

项目描述:圣塔克拉拉谷水区(Santa Clara Valley Water District)正在提议一个项目,以继续为RanchoCañadade Pala Preserve实施两个长期管理计划(LTMP)。

LTMPs的目的是确保保存is monitored, maintained, and managed in a manner that preserves its conservation values. The LTMPs consist of biological resource management and monitoring, livestock grazing management, non-native plant species management, infrastructure and facilities maintenance, routine road maintenance activities, and site improvements for the preserve.

这LTMPs include construction of site improvements (e.g., bank repairs and retaining wall rehabilitations) as needed to further improve existing conditions and facilitate
long-term management of the preserve.

与未来现场改进相关的活动可能涉及较小的分级,开挖和填充,修剪植被,建筑工地的隔离和分期,去除和更换降级基础设施。

typical equipment that may be used for future site improvements may include dump trucks, excavators, portable water tanks, power tools and hand crews and other construction equipment as needed.

接触:

圣克拉拉谷水区
注意:蒂芙尼(Tiffany Chao)
5700 Almaden Expressway, San Jose, CA 95118

For further information please contact Tiffany Chao at (408) 630-3107, or by email at[email protected]

Five-Year Fiscal Years 2022-26 Draft Capital Improvement Program

Program Description
这Capital Improvement Program (CIP) is a projection of Valley Water’s capital funding requirements for planned capital projects. The purpose of the CIP is to document planned Valley Water projects and help integrate Valley Water work with the larger community by aligning Valley Water planning with other local agency planning efforts.

这Fiscal Years 2022-26 Draft CIP, approved by Valley Water’s Board of Directors on February 23, 2021, projects funding requirements between fiscal years 2021/22 through 2025/26 and includes 67 projects totaling $8.016 billion. Approximately 16 percent of this amount, $1.3 billion, is anticipated to be funded by outside sources through reimbursements and cost-sharing partnerships. The program includes water supply, flood protection, water resources stewardship, buildings and grounds and information technology projects.

Projects in the CIP will improve, repair, replace, or construct infrastructure. There are 31 Water Supply projects ($5.4 billion), 17 projects to increase flood protection ($1.9 billion), 11 environmental restoration, enhancement and mitigation projects ($212 million), 2 projects to repair or maintain District buildings and grounds ($59 million), and 6 projects to upgrade or expand existing information technology ($50 million).

Public Review
谷水(圣克拉拉谷水地区)Draft Capital Improvement Program (CIP) for the Fiscal Years 2022–2026 was authorized by the Valley Water Board of Directors (Board) for release to the cities and county for review on February 23, 2021. It includes a description, schedule, and map for each of the capital improvements Valley Water plans to undertake over the next five years, a financial analysis and a method of financing such improvements.

有关CIP的公开听证会定于2021年4月13日下午1:00在加利福尼亚州圣何塞的Almaden Expressway 5700号的董事会委员会举行。听证会将在随后的董事会会议上继续,该会议定于2021年4月27日下午6:00举行。公开听证会将在2021年5月11日下午1:00的董事会会议上结束。CIP可在下面的链接中在线审查。可以在Five-Year Capital Improvementweb page.

During the dates, times and location mentioned above, any representative of the cities or county where Valley Water operates, or any person interested in Valley Water’s activities in constructing capital improvements, may, in person or by representative, appear and submit evidence concerning the subject of said CIP.

Following the public hearings, the Santa Clara Valley Water District Board of Directors will adopt the FY 2022-2026 Capital Improvement Program.

Five-Year Fiscal Years 2022-26 DRAFT CIP

Pacheco/Santa Clara导管通行权收购项目

项目描述:该项目将包括收购地役权和/或在圣塔克拉拉导管(SCC)保险库站点8上安装/构建一条新路径;或安装/建造砾石项圈,车道,大门,标志;和/或在现有PC和SCC导管上的37个保险库中的一些库中的新旅行路线实施,如草案中指定的IS/MND。

山谷水将从十(10)个保险库地点附近的私人土地所有者那里获得地役权,并构建一条新的砾石路径,从152号州际公路152号的现有车道到SCC保险库站点8- 公路旅行路线,可提供更有效的旅行和访问保险库。

新的砾石项圈将安装在20个现有保险库的顶部(地面)周围(地面),以允许维护人员安全进入。砾石项圈通常会尺寸为32英尺x 32英尺或更小。

谷Water would construct five new driveways to provide access from public roads to the vault locations. Valley Water would construct one new sign. Sixteen new gates would also be constructed at 12 separate site locations near public roads to provide controlled access to vaults.

这些改进(获取地役权和新建筑)将允许在当前有限的现有访问区域的管道和保险库访问和维护的新操作方法。在潮湿或限制条件期间,使用山谷水全地形车辆将减少或最大程度地减少较大车辆的影响。

Project Review:这Draft IS/MND will be posted electronically for review on the Valley Water’s website at //www.ateljeeunlimited.com/public-review-documents. The NOI will also be posted at the County of Santa Clara Clerk Recorder Office, the County of San Benito County Clerk Recorder Office, and the State Clearinghouse. Due to the current shelter in place order, hard copies of the Draft IS/MND will not be available for public review.

公众评论时期/MND将在2021年1月8日(星期五)开始,在山谷水电子发布文件后进行30天。在此公众审查期间,山谷水将接受书面的硬拷贝和电子评论项目。

Comments on the Draft MND should be submitted via US mail or electronically. The public comment period closes at 5 p.m. on Monday, Feb. 8, 2021.

Download the Engineer's Report

接触:谷Water
Attention: Michael F. Coleman, AICP
5750 Almaden Expressway, San Jose, CA 95118

For further information please contact Michael F. Coleman at (408) 630-3096, or by email at[email protected]

公众听证会上工程师的报告和CEQA Exemption Determination on the Anderson Dam Federal Energy Regulatory Commission Order Compliance Project

WHAT:关于工程师报告和CEQA豁免确定的公开听证会

WHEN:tuesday, June 23, 2020 - Item is time certain at 6:00 p.m.

在哪里teleconference Zoom

这proposed work of improvement is described in the Anderson Dam Federal Energy Regulatory Commission Order Compliance Project Engineer’s Report.

这objective of the Anderson Dam Federal Energy Regulatory Commission Order Compliance Project is being proposed to comply with an order from the Federal Energy Regulatory委员会,需要立即实施山谷水的降低风险措施保护公众免受由于地震活动而导致大坝失败的风险,以及开发和实施必要的回避,最小化和缓解措施。拟议的项目将(a)允许山谷水安全,可靠和迅速地降落安德森水库(水库),并将水库保持在所需的较低海拔高度;(b)通过构建一个新的低级出口,将与超过限制的储层水平相关的风险和较小的出口结构相关;(c)优先考虑居民和财产的下游保护;(d)最大程度地降低公共卫生和安全和环境影响of reservoir drawdown.

At the time and place fixed for the public hearing, the Board of Directors will receive comments on the Engineer’s Report and the CEQA exemption determination for the Project and consider approving the Project’s CEQA exemption determination in accordance with the California Environmental Quality Act. After considering the comments on the Engineer’s Report, the Board will decide whether or not to proceed with the Project.

For more information about this hearing or this Project, contact Yogesh Prashar at (408) 630-2323 and/or Bal Ganjoo at (408) 630-3117.


重要通知
this meeting is being held in accordance with the Brown Act as currently in effect under the State Emergency Services Act, the Governor’s Emergency Declaration related to COVID-19, and the Governor’s Executive Order N-29-20 issued on March 17, 2020 that allows attendance by members of the Board of Directors, District staff, and the public to participate and conduct the meeting by teleconference, videoconference, or both.

Members of the public wishing to address the Board during a video conferenced meeting on this item listed on the agenda, should use the “Raise Hand” or “Chat” tools located in Zoom meeting link listed on the agenda. Speakers will be acknowledged by the Board Chair in the order requests are received and granted speaking access to address the Board.

圣克拉拉谷水区(District), in complying with the Americans with Disabilities Act (ADA), requests individuals who require special accommodations to access and/or participate in District

Board meetings to please contact the Clerk of the Board’s office at (408) 630-2711, at least 3 business days before the scheduled District Board meeting to ensure that the District may assist you.

Fish and Aquatic Habitat Collaborative Effort Program Draft Environmental Impact Report

什么:EIR草案的可用性通知;公开会议通知,以征求有关计划草案环境影响报告的评论

WHEN:2021年7月21日,下午4:30

在哪里:https://valleywater.zoom.us/j/82676998470+1 669 900 9128美国(圣何塞) - 会议ID:826 7699 8470

Valley Water发布了位于圣克拉拉县的Fahce项目的EIR,以进行公开审查。2021年6月30日,星期三至2021年10月15日(星期五)。拟议的项目实施了一项鱼类栖息地恢复计划,并包括2003年FAHCE和解协议中规定的恢复措施,该协议旨在解决向州水资源控制委员会提出的水权投诉。它包括流动措施(储层重新操作规则曲线)和非流量措施,例如鱼屏障修复,以及增加产卵和饲养栖息地的措施。

项目目标:

  • Restore and maintain a healthy steelhead population in the Stevens Creek watershed through measures specified the Settlement Agreement.
  • Restore and maintain healthy steelhead and Chinook salmon populations in the Guadalupe River watershed through measures specified the Settlement Agreement.
  • Maintain flexible and reliable groundwater recharge to support current and future water supply and water deliveries for municipalities, industries, agriculture, and the environment in a practical, cost-effective, and environmentally sensitive manner so that sufficient water is available for any present or future beneficial use.

这Draft EIR identified significant environmental impacts related to terrestrial biological resources, cultural resources, tribal cultural resources, paleontological resources, and noise. Significant impacts of non-flow measures on special-status species, and on riparian and other sensitive natural communities, and paleontological resources would be reduced to less than significant levels with the implementation of mitigation measures. The proposed project non-flow measure impacts on cultural resources, tribal cultural resources, and noise would remain significant and unavoidable. None of the non-flow measures are proposed on hazardous waste sites listed under Government Code § 65962.5.

这Draft EIR may be viewedHERE。这Draft EIR is also available for in-person review at:

  • Valley Water,5750 Almaden Expressway,圣何塞,CA 95118
  • CA 95121的圣何塞Aborn Road 2635号Evergreen分支图书馆
  • Los Gatos图书馆,100 Villa Avenue,Los Gatos,CA 95030
  • Cupertino Library, 10800 Torre Avenue, Cupertino, CA 95014
  • Milpitas Library, 60 North Main Street, Milpitas, CA 95035
  • Morgan Hill Library, 660 West Main Ave, Morgan Hill, CA 95037

有关EIR草案的书面评论应由2021年10月15日(星期五)下午5:00(extended from August 16, 2021) and sent to: Ryan Heacock at[email protected]。For additional information or a CD copy of the Draft EIR, please contact Mr. Heacock at (408) 265-2600.